DR/BC Visual Timeline

DR/BC Timeline — RPO, RTO, WRT, MTD

Visualize a disruption from Normal OperationDisasterRecovery StartsNormal Operation Resumes. Toggle theme, play, save incidents, and export CSV.

Timeline

Normal Operation RPO Window RTO WRT Normal Resumed

Controls & KPIs

RTO
WRT
MTD = RTO + WRT
RPO Window

Saved Incidents

Snapshots are kept in-memory per page load.

#SavedDisasterRecovery StartsNormal operations ResumesRPORTOWRTMTD

Definitions

  • RPO: maximum acceptable data point to be recovered (window before disaster).
  • RTO: maximum time needed for data recovery (disaster → recovery starts).
  • WRT: maximum time to verify data integrity & resume operations (recovery start → normal operations resumes).
  • MTD: Maximum Tolerable Downtime = RTO + WRT.

Example: 03:00 → 06:00 → 08:00 ⇒ RTO = 3h, WRT = 2h, MTD = 5h.

Developed by Durgesh Kalya. For educational purposes only. 2025. Feedback via LinkedIn.